ME2027 [Old Code: MF441] Process Planning and Cost Estimation May June 2007 Question Paper

Are you looking for May June 2007 Question Paper of ME2027 Process Planning and Cost Estimation? You will download it here. It will be useful for upcoming examinations in Anna University Chennai. Its old code is MF441. Have a look below to find your question paper contents.

Question Paper Code : A1400
Anna University Chennai
B.E./B.Tech. DEGREE EXAMINATION MAY / JUNE 2007
Seventh Semester
Mechanical Engineering
MF 441 - PROCESS PLANNING AND COST ESTIMATION (Current Subject Code: ME2027)

Time : Three hours
Maximum : 100 marks
Answer ALL questions.

PARTA (10 x 2 = 20 marks)

1. Define standardization.

2. What is Break Even Analvsis?

3. What are the aims of costing?

4. Define Estimation.

5. List out the different components of Cost.

6. What are the factory expenses?

7., What are the losses in forging?

8. What are the Different types of labour cost involved in welding?

L Define standard time. Write formula for standard time"

10. What are the different types of milling operations?

PARTB-(5x16=80 marks)

11 (a) (i) What is the scope of process planning? (6)
(ii) Explain process planning for parts and process planning for assemblies. (10)

Or

(b) (i) what are the benefits of computer aided process planning? (6)
(ii) List out the types of computer aided process planning. Explain. (10)

12. a. (i) Describe the various cost involved in the estimating procedure (8)
(ii) What are the functions of estimating? (4)
(iii) Differentiate costing and estimation (4)

Or

(b) (i) What is the aims of estimating? (4)
(ii) What is the importance of costing? (2)
(iii) Describe the detail procedure of estimating (10)

13. a. A firm producing air circulator wants to place an improved design in the market. suggest a selling price covering the on cost and keeping the previous profit proportions on sales. The materials in new model will cost Rs. 350 and the direct wages would be Rs. 200. The following figures relate to the Previous Year. (16 marks)

Stock of material on 1st April 1976 = Rs 25,000
Stock of material on 31st March 1975 = Rs 27,000
Purchase of raw materials in this period = Rs 50,000
Manufacturing wages = Rs. 15,000
Works on cost = Rs. 7,500
Administrative and sales on cost = 7,500
Sales during the Year = Rs. 95,000

Or

(b) In a production concern the variable overhead charges are Rs 200 per article and the fixed overhead charges per month are Rs 35,000. It is estimated that 65,000 articles are produced each month under normal conditions Find :

(i) The normal overhead cost per article
(ii) If the factory cost drops to 85% production. The overhead charges that are unrecovered
(iii) If the production is increased to 130%o by what amount these charges will be over recovered (16 marks)

74. (a) 1000 stepped bolts of size shown in Fig. are to be made by machine forging. Estimate net weight, gross weight and number of bars required. If m.s bars are available in 5 metre length and 20 mm diameter. Take the density of m.s bar 7.868 gm/cm^3

(b) (i) what is the material cost of welding two plates of size 300 mm length and 150 mm with 8 mm thickness to make a piece 300 x 300 mm approximately? Use rightward technique with no edge, preparation costs. Take over all cost of oxygen as Rs.0.70 per  cu.meter, cost of acetylene at Rs. 7.00 per cu.metre, cost of filler metal Rs. 2.50 per kg. and 1 cu,cm of filler metal weighs 11.28 gms. Assume weld as rightward (12)
(ii) A lap joint is to be prepared in 9.5 mm. M.S. steel sheet using flat welding position and 6 mm electrode. current used is 250 amps and 30 volts. welding speed is 12 m/hr. and 0.3 kg of metal is deposited per metre length of joint. Labour costs Rs. 1.50/hr, power Rs. 0.2 KWH and electrode Rs. 4/kg. Efficiency of machine is 50% and operating factor is 60% Calculate the cost of labour, power and electrode per metre of weld. (4 marks)

15. (a) (i) Estimate the time taken to prepare a job as shown in fig. From mild steel stock bar 4.00 cm in diameter and 7.5 cm long. Assume the following data. (12)
Cutting speed for turning and boring operations = 20 m/min
Cutting speed for drilling operations = 30 m/min.
Feed for turning and boring operation = 0.2 mm./rev.
Feed for 20 mm drill = 0.23 mm/rev.
Depth of cut not to exceed 3 mm in any operation.


(ii) Estimate the time required for tapping a hole with 2 cm diameter tap (3 mm pitch) to a depth of 5 cm in mild steel. The return speed of the tap is to be 3 times the cutting speed which is to be 10 metres  per minute. (4)

Or

(b) (i) A cast iron block of size 20 cm x 7.5 cm is required to be shaped to reduce the thickness from 2 cm to 1.8 cm in one cut. Determine the time required for shaping if cutting speed is 20 m/min. and feed is 0.2 mm per stroke and the cutting time ratio is 3/5. (8)

(ii) Calculate the time required to rough grind a steel shaft of 3.75 cm diameter to 3.7 cm diameter size using a grinding wheel of 5 cm face and assuming a cutting speed of 12 metre/minute and depth of cut 0.0025 cm. Length of shaft to tre ground is 25 crn. (8)
Share This
Previous Post
Next Post

B.E Civil Engineer Graduated from Government College of Engineering Tirunelveli in the year 2016. She has developed this website for the welfare of students community not only for students under Anna University Chennai, but for all universities located in India. That's why her website is named as www.IndianUniversityQuestionPapers.com . If you don't find any study materials that you are looking for, you may intimate her through contact page of this website to know her so that it will be useful for providing them as early as possible. You can also share your own study materials and it can be published in this website after verification and reviewing. Thank you!

0 comments:

Pen down your valuable important comments below

Search Everything Here